BIOGAS POWER PLANT

In the context of the construction of a biogas power plant with a total capacity of 1MW in the Thessaloniki area, our company undertook the installation of the following systems:

  • Prefabricated medium voltage substations
  • Medium and low voltage high current installations
  • Automation wiring installations
  • Motion – lighting installations